A STEP-BY-STEP GUIDE TO SETTING UP A BATHTUB

A Step-by-Step Guide to Setting Up a Bathtub

A Step-by-Step Guide to Setting Up a Bathtub

Blog Article

This Page

They are making several great points relating to How to Install a Bathtub Yourself in general in this content just below.


Installing A Bathtub
Installing a bathtub isn't specifically brain surgery, however it does require solid plumbing, woodworking, and also often, tiling abilities. Replacing an old bathtub with a brand-new one is additionally a reasonably challenging project. If the old tub is conveniently obtainable, the job can move speedily; if you need to open up a wall to remove the old bathtub and also place the new bathtub, the job is a lot harder. In either situation, the project is within a residence handyman's abilities, although you will need an assistant to leave the old tub and also embeded in the new one. Make sure you have actually qualified on your own for the task and fit trying it. Instead of working with a specialist to take over a halfway-completed project, it is better to take into consideration utilizing one before you start. Possibilities are you may require an expert plumber to make tube links.
This short article will assist you install a brand-new tub in your washroom if you have actually already gotten a new bathtub and do not need to transform the arrangement of your previous water system pipes.
Your devices as well as material list should comprise the following:
  • New Bathtub
  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Safety Glasses

  • Degree

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Blade

  • Measuring tape

  • Pipe Caps


  • Planning for the Setup


    To start with, the supporting structure supplied with the bathroom needs to be fitted (if needed) according to the supplier's guidelines. Next off, fit the taps or mixer to the bath tub. When fitting the faucet block, it is important to make certain that if the faucet comes with a plastic washing machine, it is fitted between the bathroom and also the taps. On a plastic bathroom, it is also practical to fit a sustaining plate under the taps system to stop strain on the tub.
    Fit the adaptable tap ports to the bottom of both taps utilizing 2 nuts and also olives (sometimes supplied with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet opening, and afterwards pass the outlet with the hole in the bathroom. Use the nut supplied by the maker to fit the plug-hole. Check out the plug-hole outlet for an inlet on the side for the overflow pipe.
    Next off, fit completion of the flexible overflow pipeline to the overflow electrical outlet. After that, screw the pipe to the overflow face which must be fitted inside the bathroom. Make sure you use all of the provided washing machines.
    Connect the trap to the bottom of the waste outlet on the tub by winding the string of the waste electrical outlet with silicone mastic or PTFE tape, and screw on the trap to the outlet. Connect the bottom of the overflow tube in a similar manner.The bath must currently prepare to be suited its final position.

    Removing Old Taps


    If you need to change old faucets with brand-new ones as a part of your installment, after that the first thing you should do is detach the water system. After doing so, switch on the faucets to drain pipes any water remaining in the system. The process of removing the existing faucets can be fairly bothersome as a result of the limited access that is often the case.
    Use a basin wrench (crowsfoot spanner) or a tap tool to undo the nut that connects the supply pipes to the taps. Have a cloth ready for the remaining water that will come from the pipes. As soon as the supply pipelines have been gotten rid of, make use of the exact same tool to loosen the nut that holds the taps onto the bath/basin. You will certainly require to quit the solitary faucets from transforming throughout this procedure. When the faucets have been eliminated, the holes in the bath/basin will have to be cleaned of any old sealing substance.
    Prior to going on to fit the brand-new taps, compare the pipe connections on the old faucets to the brand-new faucets. If the old taps are longer than the new taps, then a shank adapter is needed for the brand-new faucets to fit.

    Setting up the Bathtub


    Using both wood boards under its feet, put the tub in the required position. The wooden boards are helpful in equally spreading out the weight of the tub over the area of the boards instead of concentrating all the weight onto 4 little points.
    The next objective is to make sure that the bathtub is leveled all round. This can be attained by checking the spirit level and readjusting the feet on the bath tub till the level checks out level.
    To install faucets, fit all-time low of the outermost versatile tap connector to the appropriate supply pipeline by making a compression sign up with; then do the same for the other faucet.
    Activate the water system as well as check all joints and also brand-new pipework for leaks and tighten them if necessary. Load the tub and also examine the overflow electrical outlet as well as the normal electrical outlet for leakages.
    Finally, fix the bathroom paneling as explained in the producer's instruction manual. Tiling and also securing around the bathtub needs to wait up until the bathtub has actually been made use of a minimum of once as this will certainly settle it right into its last position.

    Suitable New Touches


    If the tails of the new faucets are plastic, then you will require a plastic port to prevent damages to the thread. One end of the adapter fits on the plastic tail of the tap and the various other end offers a link to the existing supply pipes.
    If you require to fit a monobloc, then you will certainly need reducing couplers, which attaches the 10mm pipe of the monobloc to the typical 15mm supply pipeline.
    Next, place the tap in the placing hole in the bath/basin making certain that the washers remain in place in between the tap and also the sink. Protect the faucet in place with the supplier offered backnut. Once the tap is firmly in place, the supply pipelines can be linked to the tails of the faucets. The taps can either be attached by using corrugated copper piping or with typical faucet ports. The previous type must be connected to the faucet ends first, tightening up only by hand. The supply pipelines can later be linked to the various other end. Tighten both ends with a spanner after both ends have actually been connected.

    Tiling Around the Tub


    In the location where the bath fulfills the tile, it is needed to secure the joins with a silicone rubber caulking. This is necessary as the fitting can move sufficient to crack a stiff seal, creating the water to penetrate the wall surface in between the bath as well as the tiling, bring about problems with wetness and possible leakages to the ceiling listed below.
    You can choose from a range of coloured sealers to assimilate your fixtures as well as installations. They are sold in tubes as well as cartridges, as well as can sealing spaces as much as a size of 3mm (1/8 inch). If you have a larger gap to load, you can fill it with spins of drenched newspaper or soft rope. Remember to always load the bath tub with water before sealing, to allow for the motion experienced when the bathtub remains in use. The sealant can break relatively very early if you do not take into account this movement before sealing.
    Additionally, ceramic coving or quadrant floor tiles can be used to edge the bath or shower tray. Plastic strips of coving, which are easy to use as well as cut to size, are also easily available on the market. It is advisable to fit the tiles using water-resistant or water-proof glue and also cement.

    Bathtub Installation


    How Important Is A Bathtub To Your Home?


    High-quality baths, showers, and other bathroom updates are necessary when considering a smart investment in your home. It’s a room that you go to every day and one that is constantly being used by guests.The bathroom is one of the top trafficked rooms in a home and also one of the most valuable in terms of home resale.


    Install Piping Before Tub


    You will be using your existing drain and waste vent system, but pipes required include the hot and cold water supply lines and a pipe leading to a shower head. A mixing valve and shower head are also needed. Air chambers may be required.


    Position the Tub


    Lower the tub into place so that the continuous flange fits against the wall studs and rests on 1’x4' or 2’x4' supports. Anchor the tub to the enclosure with nails or screws inserted through the flanges into the studs.



    NOTE: Remember, bathtubs and shower stalls may require support framing. A bathtub filled with water is extremely heavy, so check building codes and framing support before installing the tub.


    Assemble Drain Connections


    Assemble the bathtub drain connections by connecting the tub overflow with the tub drain above the trap, not beyond it. The trap will have a compression fitting that screws over the arm of the overflow assembly.


    Place a Pipe For the Shower Head


    First, locate a brass female threaded winged fitting and attach it to a framing support via a screw or a nail. Then run a pipe up the wall for the shower head. Sweat or solder the other side of the brass fitting to the top of the pipe.


    Attaching Hot and Cold Water Lines


    Attach your water lines for both hot and cold by sweating these directly into the hot and cold ports of the mixing valve. The mixing valve will be how water enters the tub’s system, not by the pipes themselves.


    Install the Spout


    Extend a piece of 1/2 inch pipe, or whichever length is specified in the manufacturer’s instructions, for the tub spout. Sweat on a male threaded fitting at the end of the pipe or use a brass nipple of the proper length and a 1/2 inch cap.



    NOTE: At this point you should have your rough-in plumbing work inspected before proceeding further.


    Check For Leaks


    Restore the water pressure and check the drain connection and the supply pipes for any sign of leaking.


    estore the Bathroom Wall


    Replace the wall with moisture-resistant drywall as a base for your wall covering. Seal the joints between the wall and your new tub with silicone caulk as protection against water seepage.

    https://www.berkeys.com/2016/12/02/bathtub-installation-dallas/


    Installing A Bathtub

    I hope you enjoyed our topic about How to Install a Bathtub Yourself. Thanks for spending some time to read through our posting. For those who appreciated our page if you please make sure you remember to share it. Kudos for your time. Please come by our site back soon.




    Detail


    Report this page